A - Angle of the raised dump truck bed.
C - Circle being reworked for to the fall, 2012 arrival of the Portland Streetcar Eastside Loop.
T -Tamp Tightly like the man with the shovel in the top photo.
I - Interest I have taken in these goings on.
O - One of these days this series of posts will be complete.
N - Not a moment too soon, I'm sure some frequent visitors will testify.
S - Smoothing accomplished by that wheeled contraption in the bottom photo.
H - Hot asphalt.
O - One more sidewalk to finish; take a close look at the bottom photo.
T - Tell me what you think of my ACTION SHOT, please and thank you!


Next thing I know, the first-laid asphalt has been rolled over by that wheeled contraption the man is riding and driving. See how smooth it looks up against the curb? You can sort of see the slight dip for the truncated domes matt at the handicap section of the sidewalk, too. Now the wheeled contraption is flattening the asphalt up against the newly formed curb across the street. And asphalt is being dropped out of the dump truck to complete the entire surrounding of that point of curb. There is still no concreted sidewalk completed there, though. Up on the eastbound Hawthorne Bridge ramp you can see two men working with a traffic diversion sign of some sort, so you know that work surely continues at or close to the intersection of SE Hawthorne and SE Grand.
No comments:
Post a Comment