Showing posts with label construction crane. Show all posts
Showing posts with label construction crane. Show all posts

Thursday, September 18, 2008

Up Against It

up_against_it_close
Since Friday evening, I have been up against it, ill with fever, chills that jerked my hands, arms and legs, aches. The doctor diagnosed a urinary tract infection, once I felt like I could drive myself to his office Tuesday morning; my children were hiking and camping in the Mt. Hood area, as you can see if you scroll down to my Tuesday, Sept. 16, post. I am not back to normal, but I do feel like putting something on the blog--I have taken my last big white antibiotic tablet, but I don't think I feel as if I'm making much of a move away from it, as far as the fever is concerned for sure. I plan to call the doctor back tomorrow to seek a follow-up test and maybe a prescription refill.
up_against_it_two
Rest assured, I haven't felt good enough to feel guilty about missing these days of blogging, but in my heart of hearts, I have missed it deeply, which includes most of all visiting your wonderful blogs.

I haven't even turned on my camera--that's how bad it's been. I took these photos the same day I took the ones of the crane, either through my sunglasses or not. I posted them on Sunday, Sept. 14.

Upon reflection I realize that, before long, I will be far away from it and back in the swing of things.

Sunday, September 14, 2008

One photo taken through my sunglasses, another one without the sunglasses

091408_thru_sunglasses
Through the sunglasses
091508_not_thru_sunglasses
Not through the sunglasses

I still feel awful, but I didn't want to miss posting today. Thanks for the well-wishes.

Sunday, April 20, 2008

First and Main, I happened on the construction crane installation

Yesterday while doing errands, I decided to go through downtown and take the Hawthorne Bridge over the Willamette. I wanted to see that big hole on I've been photographing, on a weekend day. Lo and behold, folks were at work putting up a yellow construction crane. I made a couple of blocks, parked the Buick beside Chapman Square a block and a half from the hole, and set off with my camera around my neck. Unseasonably cold weather wouldn't stop me from hopefully getting some interesting photos.

Here are five of the workers I noticed after I'd snapped a few photos. I couldn't believe what I was seeing, or hearing for that matter. I swear, I could hear something that sounded like a hammer striking metal. Skilled, capable, careful workers for sure.
crane_5men_close
Situated on SW First was the black crane that picked up the pieces of the yellow crane and took them up into the air. And two more workers are in this photo.
crane_other_crane_operator_truck
If you look closely, you can see the cables from the black crane to the piece of the yellow crane. You can even see one heading down from the left end of that yellow piece, going out of the photo in the lower left corner.
crane_pieces_other_crane_close
There's a lot going on in this photo. There's the empty steel plate where the bulldozer sat in my earlier posts about this great big hole. Notice the poster that depicts the finished 15-story First and Main building. And there's another piece of the yellow crane still on the truck, plus a piece on the ground to the right of that flatbed.
crane_piece_truck_poster_bldg
In this photo that I took from a raised patio of a high rise building on the opposite corner, you can see both cranes pretty well. In no time, the leaves will be out on those trees, obstructing the view. Maybe I can get a photo from up on the sidewalk of the Hawthorne Bridge which is the opposite direction from where I'm standing now.
crane_wide
Zooming in, you can see the steel wall with the yellow crane behind it which lets you know that the base of the crane is down in the great big hole. Why has that section of the steel wall been left so high above the rest of the wall that surrounds the great big hole? This photo shows something else unique at this intersection at this particular moment. This street is usually one way east. However, the silver car beside the brown steel wall is heading west in the lane made for traffic during the crane installation. The reason this traffic flow reconfiguration took place is all of that equipment on SW First, beyond the great big hole, had to have somewhere to park. Considering how busy this intersection--the eastbound entrance to the Hawthorne Bridge and the westbound exit off the Hawthorne Bridge--is in the morning and evening workday rush hours, installing the crane on Saturday makes all sorts of good sense.
crane_base_steel_wall_close